Wholesale
How wholesale orders work
Start from a model list, not from a price list
There is no published price list: a wooden train set is a carton, a piece mix and a finish, and the same photo can hide very different cartons. Send the models or the categories you want, the quantity and the destination port, and the quotation comes back with the MOQ, carton quantity, packed size, lead time and report status for each model.
MOQ and samples
Stocked sets start from 20 pcs; track packs from 50 pcs; tables from 10 pcs; scenery and custom models are quoted per model. Stock samples ship in 3–7 days; a new piece mix, a custom print or branded packaging takes 7–15 days after artwork approval.
Mixed containers
Sets, track, engines, tables and scenery can be combined in one loading plan. The quotation lists the carton count by category so the container can be balanced instead of being filled with one line. The container-load calculator on this site estimates volume from packed sizes; the final plan is confirmed against the cartons.
FOB and lead time
Orders are quoted FOB Ningbo or Shanghai. Lead time is stated per model: typically 25–45 days for sets and engines, 20–35 days for track and scenery, 30–50 days for tables, counted from artwork/sample approval — not from the order date.
Report status
Report status is stated per model and per destination market. Where a report exists for the model and market, it is named in the quotation; where it has to be commissioned, that is said before the order rather than after. No compliance claims are made on this site.
What to send with an enquiry
Models or categories, quantity per model, destination port, target shelf date, packaging or branding requirements, and the market the products are sold in. A firm quotation follows the specification; a price band can follow a reference photo and a quantity.
MOQ and lead time by category
| Category | Typical MOQ | Typical lead time | Packing note |
|---|---|---|---|
| Complete train sets | 1-8400 pcs | 5-70 days | Carton quantity per set |
| Track, rails and switches | 1-2000 pcs | 7-90 days | Light and bulky; plan by carton |
| Engines, carriages and wagons | 4-1000 pcs | 5-45 days | Small cartons; mixed easily |
| Train tables and stations | 2-500 pcs | 15-60 days | Flat-pack; packed size quoted |
| Bridges, tunnels and signals | 3-1000 pcs | 7-90 days | Small cartons |
| Accessories and scenery | 1-1000 pcs | 7-65 days | Small cartons |
| Pull-along and first trains | 5-2000 pcs | 31-70 days | Shelf-ready cartons |
| Custom and personalised | 6-8000 pcs | 31-150 days | Custom packaging per project |